Loma Terrace Elementary School
![Bond Header](https://cmsv2-assets.apptegy.net/uploads/22704/file/3222251/b6568315-4506-4d7c-81f7-13ed9564bfb5.png)
![school building from the outside](https://cmsv2-assets.apptegy.net/uploads/25107/file/3344174/1115356e-3d1b-4d7f-bb76-076dbc1c141c.jpeg)
Loma Terrace High School
Controlled entry vestibule
Exterior envelope upgrades
Upgrade student and staff restrooms (ADA)
Interior upgrades at classrooms
HVAC upgrade - replace evaporative cooling with refrigerated air
Provide an automatic fire sprinkler system
Estimated Cost for This Campus
$3,202,800**
![Ad saying "stay informed through social media icons from Facebook, X, Youtube and Online Tax calculator" logo](https://cmsv2-assets.apptegy.net/uploads/25107/file/3344177/e75f1322-7d3f-4f48-884d-9f63bdb96639.png)
![](https://cmsv2-assets.apptegy.net/uploads/22704/file/3223989/f3ab4519-e111-49a1-b516-2c4626dada89.png)
These plans are preliminary and subject to change. The final projects and actual use of bond proceeds will be determined by subsequent Board action following approval of the bond by the voters.
This total is based on an anticipated project schedule and adjusted for inflation. Project totals may change based on revised project schedules during the course of the five-year period.